Write a game design document by recording what the player does, the rules the team will implement, what belongs in the next build and how someone will check it. Start with the next feature a teammate needs to make. Give it a clear rule, name its dependencies and describe an observable pass or fail.
A GDD is a shared working reference. Give it an owner, a version and a design status so readers can tell which decisions they can act on. The outline below is ready to copy; the completed example shows how its fields lead into a build check.
A copyable GDD outline
Replace the brackets with decisions. Where something remains unresolved, record the question and who will answer it.
Document owner:
[Person responsible for keeping design decisions current.]
Readers:
[Who uses this document, and what each person needs from it.]
Version and date:
[Version number and last revision date.]
Design status:
[Proposed, agreed for implementation or superseded.
Name the decision-maker and any pending decision.]
Audience:
[Who the game is for, platform and intended play situation.]
One-sentence concept:
[What the player does and why it is appealing.]
Design pillars:
[Two or three priorities that guide choices.
Explain what each priority means in practice.]
Core loop:
[The sequence of player actions, feedback and next choice.]
Controls:
[Each input and its effect.]
System rules:
[Feature ID; trigger; conditions; behaviour.
Include behaviour during invalid or repeated input.]
Failure/recovery:
[What prevents success, how the game communicates it
and what the player can do next.]
Progression:
[What changes or becomes available as the player proceeds.]
Presentation/accessibility:
[Essential visual, audio and text feedback.
How information remains understandable without colour alone.]
Scope/dependencies:
[Included in this build; excluded from this build.
Required data, assets, systems and test setups, with owners.]
Validation:
[For each check: setup → action → expected observable result.
Record the build identifier, observed result and evidence.
Name who reviews the evidence and what decision it enables.]
Supporting specs and backlog:
[Links to detailed specifications and implementation tasks.
Use the feature ID to connect them to the relevant rule.]
Change log:
[Version/date; decision changed; reason; owner.
Identify affected specifications, tasks and checks.]
Choose the depth the decision needs
There is no universal layout or minimum length. During pre-production, a short outline and a prototype question may be enough. For a tile puzzle, that question might be: can a player recognise a broken route and understand how to repair it? Expand the rules when someone needs to implement or test the answer.
Unity’s production teaching includes story, gameplay, art direction, the target audience and accessibility among design-document topics. Give each topic enough space to support a decision. A puzzle’s essential route feedback may need more detail than its backstory.
In an RPG, for example, “help the village scout” leaves several implementation questions open. A useful quest entry could specify that speaking to the gatekeeper unlocks the quest, the scout’s death moves it into a failed state, and escorting the scout home moves it into a completed state that unlocks the next quest. Those unlock, failure and progression states tell a teammate what must happen and give a tester distinct conditions to check.
Filled example: Lantern Post
Lantern Post is a fictional teaching project: a portrait mobile puzzle for players who want a short solo session. This completed example proposes a design and its acceptance checks. It does not represent an actual build, studio, test or published result.
- Document owner:
-
The designer maintains the GDD and resolves questions about the intended rules. The producer reviews whether the feature is ready for inclusion in the vertical slice.
- Readers:
-
The developer needs the route and input rules. The UI designer needs the available, blocked and delivering states. QA needs reproducible setups and expected results. The producer needs the scope, dependencies and evidence required for a slice decision.
- Version and date:
-
0.1 — 24 November 2026, an illustrative first-draft date.
- Design status:
-
Proposed for implementation. The designer would record agreement before work begins. Inclusion of LP-07 in the slice remains subject to the checks below and the producer’s review.
- Audience:
-
Players using a mobile phone in portrait orientation who want a short puzzle session they can play alone.
- One-sentence concept:
-
Rotate path tiles to connect a dock to a lighthouse, then send a courier light along the completed route.
- Design pillars:
-
- Short solo sessions: let players work on one layout and choose another after delivery feedback.
- Readable connections: make the route and its first break understandable.
- Easy recovery: let players keep rotating tiles when the route is incomplete.
- Core loop:
-
Choose a layout → rotate path tiles → complete the route → tap Send → watch the courier light travel → read delivery feedback → choose another level.
- Controls:
-
Tap a path tile to rotate it. Tap Send when it is available to start delivery. Use the level choice after delivery feedback to select another layout.
- System rules:
-
LP-07 — Send and route validation. When Send is tapped, an unbroken route from the dock, including a connection at the lighthouse, starts delivery once.
A broken route leaves Send unavailable. The interface identifies the first break, tracing from the dock, with an icon and text. Tile rotation remains available. Further Send input while delivery animates has no effect.
- Failure/recovery:
-
An incomplete route prevents delivery. Show the first missing connection with an icon and a text explanation, including a missing connection at the lighthouse when that is the first break. The player can rotate tiles to repair the route; Send becomes available when the route is complete.
- Progression:
-
The tutorial introduces tile rotation and sending the courier light. Following delivery feedback, the player can pick another level. The slice needs no further progression system.
- Presentation/accessibility:
-
Keep the path connections and courier light clear in portrait view. Communicate a broken route through an icon and text, so colour is not the only cue. Make Send’s availability and delivery feedback understandable through visible interface states and readable messages.
- Scope/dependencies:
-
Included: one tutorial and three test layouts for the vertical slice—a small playable sample of the intended experience.
Excluded: multiplayer, daily challenges and paid items.
Required for LP-07: the developer needs layout data describing neighbouring tile connections and the lighthouse connection; the UI designer needs route-status feedback with a non-colour cue; QA needs broken-route, valid-route and repeated-tap setups.
Annotation: scope states what this build contains. Dependencies state what must be available to implement and check it. An included feature can still be waiting on a dependency.
- Validation:
-
Run the three proposed LP-07 checks below. Record the build identifier, setup, action, expected result, observed result and evidence for each. When all three expected behaviours are evidenced in the same recorded build, the producer can review LP-07 for slice inclusion.
Annotation: these are acceptance conditions. They become verified results only after someone runs the checks and records what happened.
- Supporting specs and backlog:
-
Proposed supporting records: a connection-data specification, a route-status UI specification, implementation tasks and QA checks. Link them here when created, and reference LP-07 in each. Keep the intended behaviour in the GDD; use the supporting records for detailed data, interface and work-tracking information.
- Change log:
-
0.1 — 24 November 2026: illustrative initial entry defining the slice boundary, LP-07 and its proposed checks. Owner: designer. No build evidence recorded.
Turn LP-07 into a build check
The rule describes intended behaviour. Its dependencies make that behaviour possible. Acceptance checks let another person observe whether the build follows the rule.
| Setup and action | Pass if | Fail if |
|---|---|---|
| Use a route whose first break is the missing connection into the lighthouse. Inspect Send, then rotate a tile. | Send is unavailable; the first break has an icon and text; tile rotation works. | Send is available, the break is incorrectly identified, either cue is missing, or rotation is blocked. |
| Use an unbroken route from the dock with matching neighbouring connections and a connection at the lighthouse. Tap Send once. | One delivery starts and the courier light travels along the completed route. | No delivery starts, more than one starts, or delivery does not follow the completed route. |
| Start delivery on a valid route. Attempt Send repeatedly while it animates, and observe through completion. | The repeated input has no effect: the running delivery continues without restarting, and no extra delivery is started or queued. | The repeated input changes the running delivery or produces an additional delivery. |
For each check, attach a recording or other evidence that shows the relevant input and behaviour. Use the same build identifier across all three records. If a fix creates a new build, collect the required evidence against that build before requesting the producer’s review. Evidence gathered across different versions cannot establish that one build satisfies all three conditions.
The producer’s review is a separate decision: passing these checks makes LP-07 eligible for consideration within the agreed slice scope.
Give each document a clear job
| Document | Primary readers | Decision it records or supports |
|---|---|---|
| GDD | Designers, developers, artists, QA and the producer | What the player experience and rules should be, what is in scope and how the team will check the behaviour. |
| Pitch | Publishers, partners and other outside reviewers | Whether the concept is worth further discussion, support or investment. |
| Backlog | The people planning and delivering the work | Which tasks are needed, their priority, who owns them and their delivery status. |
A one-page GDD can compress a decision while retaining its rule, scope and check. For an outside review, the game pitch and high-concept document explain the idea and its appeal. The game production pipeline provides stage gates at which the team decides whether the work is ready to move forward.
The Trick Gaming Studios account offers an example of a team pairing a design document with a task board. That pairing gives the team places to describe the design and track its implementation. A completed task still needs evidence that the implemented behaviour matches the current rule.
Historical documents also show why versions matter. Tom Hall’s Doom Bible, design revision 0.02 dated 28 November 1992, contains sections on gameplay and story. Read it as a planning document capturing design intentions at that point in development; it does not promise the contents of the shipped game.
Keep the working version dependable
The document owner should update the GDD whenever an agreed change affects a rule, scope boundary, dependency or acceptance condition. Change the version and date, record the decision and reason in the change log, and identify the specifications, tasks and checks affected. Keep proposals visibly marked until the responsible person agrees them.
Update supporting specifications when implementation detail changes, such as the connection-data format. Update backlog tickets when work is assigned, prioritised, blocked or completed. If a technical discovery requires different player behaviour, bring that decision back into the GDD and revise the affected checks. Readers should be able to trace a task to the rule it implements.
Keep design status separate from delivery status. “Agreed for implementation” describes a design decision. “Implemented” describes work progress. “Verified in build” requires recorded evidence. A producer’s slice-inclusion decision follows its own review.
In Google Docs, paste the plain outline into a new document, replace the brackets and apply heading styles to the field labels. Keep the owner, version and design status near the top. Designate that document as the source of truth and link supporting specifications and backlog records from it. Treat exported or copied versions as dated snapshots so teammates know where to find the current decision.
