A game production pipeline turns an idea into a releasable game through a series of agreed handoffs. At each boundary, someone delivers a usable result, someone checks it against clear conditions, and a named person decides whether work can advance. For a small indie team, those decisions matter more than the number of stages on a planning board.
One person may hold several roles. The useful distinction is between making the work and accepting it: “the build exists” does not mean “the build is ready for the next stage”. Record the version, the evidence and the decision so that the next task starts from an agreed foundation.
A prototype answers a question; a slice tests the work
A prototype should resolve a specific uncertainty. It may use placeholder art, temporary controls and disposable code if those choices help answer the question quickly. Its success condition is learning enough to make a decision.
A vertical slice exercises representative production work in an integrated build. It shows whether design, engineering, art, interface, audio and testing can come together at the intended standard. A convincing prototype does not establish that the team can repeatedly produce finished content.
Consider Lantern Post, an invented teaching example: players arrange tiles to form a message route, then press Send. A prototype might investigate whether players understand why a route fails. The slice must also demonstrate how the team builds layouts, communicates route states, integrates changes and checks the result.
Follow the deliverable across each boundary
The matrix below defines example game development milestones for Lantern Post. GDD means game design document; here it is a short, versioned description of the agreed design. The slice baseline is the agreed rules, build reference and acceptance conditions. LP-07 identifies the example Send-path check.
| Stage | Input | Output | Responsible role | Dependency | Go or rework decision |
|---|---|---|---|---|---|
| Concept | Hypothesis about tile routing and Send. | Versioned short GDD. | Design owner. | A clear player action and intended result. | Design owner accepts a testable direction or revises the hypothesis. |
| Pre-production | GDD and unanswered tile/Send risk. | Engineering greybox, a playable layout using placeholders, plus test card. | Engineering; producer decides scope. | Evidence addressing the identified uncertainty. | Producer authorises slice scope or requests further investigation. |
| Vertical slice | Agreed baseline. | Integrated build containing one tutorial and three test layouts. | Team delivers; QA checks LP-07. | Valid, broken and repeated Send paths; usable feedback. | Producer authorises repeatable production when criteria pass; otherwise assigns rework. |
| Production | Locked slice rules. | Remaining approved content and integration; feature-complete candidate. | Content contributors; build owner produces candidate. | Approved content list and working integration. | Build owner confirms completeness or returns missing work to production. |
| Stabilisation | Candidate and regression list. | Versioned device, start, save and regression evidence. | QA supplies evidence; producer accepts candidate. | Identified build, agreed devices and passing acceptance checks. | Approve candidate or require fixes and fresh evidence. |
| Release | Approved candidate. | Distribution-ready handoff with support and rollback ownership. | Producer. | Distribution preparation and named response owners. | Producer confirms readiness or holds release until gaps close. |
Make a failed check change the next action
For this example, LP-07 asks whether a valid route completes correctly, a broken route explains the interruption, and repeated Send presses avoid duplicate progression. These are proposed acceptance checks, not results from an actual test.
Suppose the broken-route check fails because the only warning is a colour change. QA records the build version, layout, steps and observed behaviour, then returns LP-07 to UI and engineering. The dependency is updated: the replacement build must meet the existing non-colour feedback requirement with a visible break marker and explanatory text.
A changed task status cannot close that failure. UI and engineering must deliver the correction in a new build before QA can retest it. The producer then uses the updated evidence to decide whether the slice can advance. This gives game development project management a concrete purpose: keeping decisions connected to delivered work.
Define milestone names for your project
Stage names vary. Unity teaches preproduction, production, post and operations in one approach. The Unity-USC toolkit presents concept, prototype, slice and build milestones for a course. Neither supplies universal gate names for every indie project.
If you use alpha and beta, define them locally. For Lantern Post, alpha could mean all approved features are integrated; beta could mean content is complete and agreed regression checks pass. These are example definitions. Attach the relevant deliverable and acceptance conditions to each label.
Give release and operations different scopes
Release covers getting the approved candidate ready for distribution and assigning support and rollback responsibility. Later operations cover the ongoing work your game needs after launch. An asset production pipeline may continue through updates, but new content still needs integration and acceptance. Before advancing any stage, check three things: what version crossed the boundary, what evidence supports it, and who accepted it.